£6.55
This guidance note relates to schedules intended to be used for the valuation of additional work and/or variations to existing lump sum contracts. For the avoidance of doubt this guidance note does not relate to schedules of rates used in connection with contracts which are re-measured as the works proceed.
This guidance is available for pdf download only.
Daywork is a method of valuing construction work according to the time spent carrying out work together with the value of the plant and materials resources used. It is an alternative to valuing work by measurement. This guidance outlines when daywork can be charged, how it can be calculated and administration. This guidance is available for pdf download only. 4 pages
The reliance by the scaffolding contractor, on the skill and expertise of their operatives, will not relieve them of their responsibility for the adequacy of the design. This guidance outlines design criteria, training needs, insurance, ownership/copyright and common misconceptions when utilising a designer for scaffolding. 4 pages
This guidance outlines the differences between an estimate, quotation and tender and provides advice and recommendations on how to provide a well drafted quote. 2 pages
Contracts impose obligations on the parties to the contract to complete their works within an agreed period of time. Should the Scaffolding Company fail to complete any of its obligations within the agreed period of time the Employer may be entitled to deduct LAD’s from the Scaffolding Companies account. This guidance outlines the types of liquidated damages, enforcement and considerations. 2 pages
Please enter a postcode to search for a member: