£7.65
This NASC guidance note has been written to reflect the Control of Asbestos Regulations 2012 and has been produced following consultation and advice from the Asbestos Licensing Unit (ALU). (ACOP Ref: Managing and working with Asbestos – Control of Asbestos Regulations 2012 – L143 and follows ALG Memo 01/10 Ancillary asbestos licenses for scaffolding.)
This product is available in PDF format only.
8 pages
The Health & Safety at Work Act 1974 requires that employers give all employees sufficient information, training & supervision as is necessary for their Health & Safety. A broad guidance reminding us to ensure good preparation and emphasising to employees the areas of responsibility we all have in working safely. 4 pages
The NASC are committed to involving everyone in health and safety matters whether on construction sites or in the office. To effect a change we must consider our workforce and consult with all those involved in a project, listening to and where necessary acting upon the views of the workforce. 8 pages
This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
This guidance outlines how employers should complete their risk assessments as required by the Management of Health and Safety at Work Regulations. As employers you must carry out an assessment to identify the hazards, evaluate the risks to employees and identify any control measures which should be implemented. 16 pages
This document gives scaffolding companies and clients guidance on The Work at Height Regulations 2005 (WAHR 2005) relating to safe means of access to and from scaffolding working platforms. The Construction (Design and Management) Regulations (CDM) outline that clients, principal designers, principal contractors, designers and contractors should consider what form of access may be needed at the planning stage. This should include any emergency escape routes that have been identified by the risk assessment, the preferred option for access / egress and the required number of access points. On larger projects powered passenger / goods hoists may be a safer option if available. Where passenger hoists are used, an additional means of access will be required for emergency purposes (e.g. in the event of a fire or mechanical failure). This update is significant in that key changes are ‘Ladder Safety’ and ‘Security’ of access onto scaffolds that differs to the earlier SG25:14. 16 pages
More than a quarter of the accidents reported each year by NASC members to enforcing authorities are associated with manual handling – the transporting or supporting of loads by hand, or by bodily force. A well-established document that proved to still be robust and valid. This revised guidance focuses on the management of manual handling and includes the Health & Safety Executive (HSE) Manual handling assessment charts (MAC tool) – helps assess the risks posed by lifting, carrying and team manual handling activities. The MAC tool also assists the assessor to understand, interpret and categorise the level of risk of the various known risk factors associated with these activities. It also has a numerical and colour coding score system to highlight high-risk manual handling tasks. An example of Manual Handling Risk Assessment form is included. 16 pages.
Please enter a postcode to search for a member: