£5.45
Traditionally, flame retardant timber decking has long been a fundamental requirement for scaffolding in various sectors of the industry. However, in the light of the ‘Grenfell’ disaster, there has been a substantial increase in the number of contracts which specify the need for flame retardant scaffold boards.
This document gives details of various fire retardant treatments available, the recommended specification and guidance for care and storage. This guidance is available for pdf download only.
2 pages.
The effects of heat on scaffolding equipment can have a significant and permanent effect on its strength and performance. This guidance explains the potential issues and the action to be taken if equipment has been subjected to a fire or similar conditions. This guidance is available for pdf download only.
This guidance gives details of the stress corrosion cracking (SCC) that can occur in certain materials when subjected to tensile stress and specific corrosive environments. Although rare in our industry, it can lead to unexpected sudden failure of certain metals. Whilst chemical environments and alloys are highly specific, this guidance explains the process by which SCC can occur and advises that specialist advice may be needed where SCC is possible or has occurred in the past. This guidance is available for pdf download only.
2 pages
BS2482:2009 defines both visual and machine strength grading standards for 38mm x 225mm boards supported at 1.2m spans and 63mm x 225mm boards supported at 2.5m spans; and machine strength grading standards only for 38mm x 225mm boards supported at 1.5m spans. This guidance is reviewed on the basis of removing A grade boards that should not exist. A visually graded board is still a BS2482 product and should be marked as such on the end band. 6 pages
This guidance explains the differences between ‘supplementary’ and ‘check’ couplers and gives typical design applications where high coupler forces could be expected and where additional loadbearing capacity to connections may be required. It also contains guidance on coupler configurations and expected safe working loads (SWLs) where supplementary couplers are used. To ensure that SWL values are as accurate as possible, data provided within this document is based on practical testing rather than calculation. 2 pages
Scaffold tube storage racks are a common feature of every scaffolding contractor’s yard and many long-term live sites. Whilst tube racks are usually constructed as basic birdcage-like structures, they generally support many tonnes of equipment, so their design needs special consideration. This guidance note considers the design, use and maintenance of scaffold tube storage racks. 6 pages