£9.50
A 32-page, full-colour pocket guide in A6 format. This document summarises clearly the requirements for TG20:21 compliant scaffolding and offers indispensable guidance to the scaffolding operative on-site. Price is £9.50 per copy for non-NASC members and £4.75 per copy for NASC members.
Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
TG4:19 had amendments predominantly in relation to the orientation of ring bolts where current thinking is that settlement is probably greater than side wind loads so reduces potential shear loads on the bolt. Other minor changes were cosmetic. A recent update in April 2019 saw the removal of one reference only when the guidance was reissued as TG4:19. 24 pages
In an ideal world all working platforms should contain no gaps or holes. This updated guidance is a simplification of the previous 2003 issue regarding working platforms, which have additional requirements over those that are normally provided on an access scaffold. Quality and the thickness of ply used are integral. 4 pages
A 32-page, full-colour pocket guide in A6 format. This document summarises clearly the requirements for TG20:21 compliant scaffolding and offers indispensable guidance to the scaffolding operative on-site. Price is £9.50 per copy for non-NASC members and £4.75 per copy for NASC members. Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
Many free-standing scaffolding structures, such as access towers, major signboards, fences and enclosures, need to be anchored to the ground, primarily to resist wind forces. Whilst all structures requiring restraint via anchoring to the ground should be subject to a bespoke design produced by a competent engineer, the guidance considers different types of anchors available and typical indicative holding capacities, the possibility of disturbing underground services, the use of guys and scaffold tube restraint. 6 pages
The effects of heat on scaffolding equipment can have a significant and permanent effect on its strength and performance. This guidance explains the potential issues and the action to be taken if equipment has been subjected to a fire or similar conditions. This guidance is available for pdf download only.
This guidance gives details of various methods available for satisfactorily securing scaffold boards to prevent movement. Users should satisfy themselves when/which boards require tying down and that any proprietary equipment or fixing method selected meets their requirements. This product is available in PDF format only. 4 pages
In order to be able to visually identify EN74 certified couplers, this guidance document identifies the specification and minimum markings to be found on all EN74-1:2005 and EN74-1:2022 scaffold couplers, together with brief details regarding the differences between the two standards. This product is available in PDF format only.
2 pages
This guidance explains the differences between ‘supplementary’ and ‘check’ couplers and gives typical design applications where high coupler forces could be expected and where additional loadbearing capacity to connections may be required. It also contains guidance on coupler configurations and expected safe working loads (SWLs) where supplementary couplers are used. To ensure that SWL values are as accurate as possible, data provided within this document is based on practical testing rather than calculation. 2 pages
A temporary roof or building is a sheeted structure designed to protect the area inside from the effects of weather, dust, etc. This guide is intended to give design and construction information to the suppliers and erectors of temporary roofs and buildings and intended for use by contractors during the building process. 56 pages
Traditionally, flame retardant timber decking has long been a fundamental requirement for scaffolding in various sectors of the industry. However, in the light of the ‘Grenfell’ disaster, there has been a substantial increase in the number of contracts which specify the need for flame retardant scaffold boards. This document gives details of various fire retardant treatments available, the recommended specification and guidance for care and storage. This guidance is available for pdf download only. 2 pages.
The TG20 Operational Guide contains detailed practical guidance for most common types of scaffolding, supported by structural research and calculation. Guidance is provided for a range of standard structures which includes independent scaffolding, interior birdcages, chimney stack scaffolds, loading bays, ladder-access towers, free-standing towers, lift shaft towers, putlog scaffolding, exterior birdcages, tube and fitting mobile towers, tube and fitting loading bays without beams, and tied independent scaffolds with three inside boards. NASC members can purchase 10 or more copies of the TG20:21 Operational Guide book at the discounted rate of £25 per unit. To do so, please email sales@nasc.org.uk
BS2482:2009 defines both visual and machine strength grading standards for 38mm x 225mm boards supported at 1.2m spans and 63mm x 225mm boards supported at 2.5m spans; and machine strength grading standards only for 38mm x 225mm boards supported at 1.5m spans. This guidance is reviewed on the basis of removing A grade boards that should not exist. A visually graded board is still a BS2482 product and should be marked as such on the end band. 6 pages
Please enter a postcode to search for a member: