This guide is intended to aid those who commission scaffold designs by summarising the responsibilities of each party involved at each stage of the process. It also details the requirements for preparing a design brief with information required by the Designer to enable a suitable and sufficient design to be produced, as well as outlining the design process, checking requirements and expected output information. This document is complimented by CG6: Scaffold Design. 6 pages.
Out of stock
This guidance gives details of the Fire Retardant treatments available for timber scaffold boards and battens. 4 pages
TG4:19 had amendments predominantly in relation to the orientation of ring bolts where current thinking is that settlement is probably greater than side wind loads so reduces potential shear loads on the bolt. Other minor changes were cosmetic. A recent update in April 2019 saw the removal of one reference only when the guidance was reissued as TG4:19. 24 pages
In an ideal world all working platforms should contain no gaps or holes. This updated guidance is a simplification of the previous 2003 issue regarding working platforms, which have additional requirements over those that are normally provided on an access scaffold. Quality and the thickness of ply used are integral. 4 pages
This guidance identifies the specification and test requirements and minimum markings to be found on all EN74-1 scaffold fittings. The 2015 update sees no change other than dates. EN74-1 is unlikely to change in the next four years.