£5.15
A licence is required in order to erect a scaffold on or above the public highway. The licence is issued under section 169 of the Highways Act 1980, generally by the highway authority responsible for the particular stretch of highway. This guidance indicates the type of information that may be required.
2 pages
This document gives scaffolding companies and clients guidance on The Work at Height Regulations 2005 (WAHR 2005) relating to safe means of access to and from scaffolding working platforms. The Construction (Design and Management) Regulations (CDM) outline that clients, principal designers, principal contractors, designers and contractors should consider what form of access may be needed at the planning stage. This should include any emergency escape routes that have been identified by the risk assessment, the preferred option for access / egress and the required number of access points. On larger projects powered passenger / goods hoists may be a safer option if available. Where passenger hoists are used, an additional means of access will be required for emergency purposes (e.g. in the event of a fire or mechanical failure). This update is significant in that key changes are ‘Ladder Safety’ and ‘Security’ of access onto scaffolds that differs to the earlier SG25:14. 16 pages
Where it is not reasonably practicable to avoid entering a confined space to undertake work, the employer or self-employed person is responsible for ensuring that a safe system of work is used. This recently updated guidance outlines the hazards associated with Confined Space Entry. 7 pages
The NASC are committed to involving everyone in health and safety matters whether on construction sites or in the office. To effect a change we must consider our workforce and consult with all those involved in a project, listening to and where necessary acting upon the views of the workforce. 8 pages
This guidance note is concerned with advice for the safe erection, use and dismantling of temporary suspended chutes intended for the conveyance of waste construction materials. The guidance covers chutes constructed of detachable sections made of metal or non-metallic material, attached to scaffolding. 4 pages
This guidance explains the definition of operating under the terms of the 'Construction Act'. Includes advice on contract terms and receiving payment under the scheme. This guidance is available for pdf download only.
This guidance note relates to schedules intended to be used for the valuation of additional work and/or variations to existing lump sum contracts. For the avoidance of doubt this guidance note does not relate to schedules of rates used in connection with contracts which are re-measured as the works proceed. This guidance is available for pdf download only.
The purpose of this guidance note is to bring together, in one document, some of the more common qualifications used by members. It is not suggested that the list is exhaustive or that the wording of individual clauses is appropriate to each and every similar situation. However, it may serve as a check list for estimators. 10 pages
Please enter a postcode to search for a member:
Please complete the fields below: