This document gives scaffolding companies and clients guidance on The Work at Height Regulations 2005 (WAHR 2005) relating to safe means of access to and from scaffolding working platforms. The Construction (Design and Management) Regulations (CDM) outline that clients, principal designers,
principal contractors, designers and contractors should consider what form of access may be needed at the planning stage. This should include any emergency escape routes that have been identified by the risk assessment, the preferred option for access / egress and the required number of access points. On larger projects powered passenger / goods hoists may be a safer option if available. Where passenger hoists are used, an additional means of access will be required for emergency purposes (e.g. in the event of a fire or mechanical failure). This update is significant in that key changes are ‘Ladder Safety’ and ‘Security’ of access onto scaffolds that differs to the earlier SG25:14.
16 pages
This guidance outlines how employers should complete their risk assessments as required by the Management of Health and Safety at Work Regulations. As employers you must carry out an assessment to identify the hazards, evaluate the risks to employees and identify any control measures which should be implemented. 16 pages
The ‘good practice’ document has been produced by the NASC, it is a completely updated version. It provides guidance for scaffolders on the planning and safe use of construction hoists, including transport platforms, used for moving scaffolding materials during the erection and dismantling of scaffolding. 32 pages. This guidance is available for pdf download only.
This revision has been a fine-tuned following a systematic review of the guidance and understanding the realisation of substantial health and safety improvements in work areas previously targeted. The core principles of SG4 remain unchanged, albeit with continued emphasis on the 'Scaffolders' Safe Zone' method of working. To get the summary of changes to SG4, go to https://nasc.org.uk/wp-content/uploads/2024/05/Changes-to-SG4.docx 61 pages. This guidance is available for pdf download only.
This document is intended to provide guidance to persons that are involved in the planning, management, supervision and use of lifting equipment and accessories for lifting. Gin wheels, mobile cranes and accessories for dangerous areas faced on site.
The Handover Certificate will advise the client that at the time of the handover, the scaffold has been built to the required specification, it was suitable for the duty intended, it complies with the requirements of the Statutory Regulations, was structurally sound and in a safe condition for use.