£14.00
The Handover Certificate will advise the client that at the time of the handover, the scaffold has been built to the required specification, it was suitable for the duty intended, it complies with the requirements of the Statutory Regulations, was structurally sound and in a safe condition for use.
SG6:22 User Guide (pocket-sized). Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
Due to the nature of their work, scaffolders need to carefully consider any work that will be carried out in the vicinity of overhead power lines. This guidance enables operatives to understand the various hazards when working around overhead power lines and the procedures for applying safe working practices and earthing scaffold structures. 12 pages
Employers are responsible for establishing an inspection regime for the inspection of fall protection equipment that is produced and implemented by a competent person. A Register of equipment should be compiled for use in managing the inspection regime.
8 pages
This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
Please enter a postcode to search for a member:
Please complete the fields below: