The SG6 manual handling video can now be viewed free of charge on the NASC website here: https://nasc.org.uk/information/sg6-video/
This NASC guidance note has been written to reflect the Control of Asbestos Regulations 2012 and has been produced following consultation and advice from the Asbestos Licensing Unit (ALU). (ACOP Ref: Managing and working with Asbestos – Control of Asbestos Regulations 2012 – L143 and follows ALG Memo 01/10 Ancillary asbestos licenses for scaffolding.) This product is available in PDF format only. 8 pages
This document includes simple changes in the requirements of reporting to be noted for your RIDDOR needs
4 pages
Initially there is no structure in place against which the scaffold can be tied. The scaffold may surround a structure, but it is still vital that measures to ensure stability are incorporated. Accordingly the initial stability of the scaffold structure must be achieved by means other than ties. Design input is still critical. 8 pages
This document is intended to provide guidance to persons that are involved in the planning, management, supervision and use of lifting equipment and accessories for lifting. Gin wheels, mobile cranes and accessories for dangerous areas faced on site.
16 pages
Please enter a postcode to search for a member:
Please complete the fields below: