£10.25
This Safety Guidance provides safety measures for scaffolding work carried out over / near water (including on, adjacent to or over water) where potential hazards exist. Employers should conduct a comprehensive risk assessment for this kind of work, taking into account the hazards identified and evaluated during the assessment, to develop a safe system of work.
Employers are also responsible for providing their workers with the necessary safety information, instruction, training, and supervision. In addition, safety measures on the use of lifting appliances / mobile plant, lifejackets / buoyancy aids for work over / near water should be intensified throughout the construction period. To prevent any person from falling from a height, suitable safety measures should also be developed and implemented.
Besides, effective rescue and emergency arrangements should be well established for work over / near water so as to safeguard the workers in an emergency situation.
Construction workers including scaffolders need adequate toilet and washing facilities, a place to warm up and eat food and somewhere to store clothing, keeping street clothing separate from work clothing to avoid any contamination. 4 pages
Booklet 110 pages Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
More than a quarter of the accidents reported each year by NASC members to enforcing authorities are associated with manual handling – the transporting or supporting of loads by hand, or by bodily force. A well-established document that proved to still be robust and valid. This revised guidance focuses on the management of manual handling and includes the Health & Safety Executive (HSE) Manual handling assessment charts (MAC tool) – helps assess the risks posed by lifting, carrying and team manual handling activities. The MAC tool also assists the assessor to understand, interpret and categorise the level of risk of the various known risk factors associated with these activities. It also has a numerical and colour coding score system to highlight high-risk manual handling tasks. An example of Manual Handling Risk Assessment form is included. 16 pages.
Employers are responsible for establishing an inspection regime for the inspection of fall protection equipment that is produced and implemented by a competent person. A Register of equipment should be compiled for use in managing the inspection regime.
8 pages
Please enter a postcode to search for a member:
Please complete the fields below: