£6.55
This guidance note relates to schedules intended to be used for the valuation of additional work and/or variations to existing lump sum contracts. For the avoidance of doubt this guidance note does not relate to schedules of rates used in connection with contracts which are re-measured as the works proceed.
This guidance is available for pdf download only.
Other than for very small contracts most contracts of any size have a pre-contract meeting. The primary purpose of the meeting is often for the parties to clarify specific points in the enquiry and quotation. This guidance outlines items to be covered in the meeting, pitfalls and a recommended strategy. 2 pages
This new guidance gives contractors help and assistance when taking on new operatives and reflects the latest rules and regulations following Brexit changes which came into force on July 1 2021.
The reliance by the scaffolding contractor, on the skill and expertise of their operatives, will not relieve them of their responsibility for the adequacy of the design. This guidance outlines design criteria, training needs, insurance, ownership/copyright and common misconceptions when utilising a designer for scaffolding. 4 pages
This guidance outlines the differences between an estimate, quotation and tender and provides advice and recommendations on how to provide a well drafted quote. 2 pages
Please enter a postcode to search for a member:
Please complete the fields below: