£10.25
This new guidance gives contractors help and assistance when taking on new operatives and reflects the latest rules and regulations following Brexit changes which came into force on July 1 2021.
This guidance outlines the differences between an estimate, quotation and tender and provides advice and recommendations on how to provide a well drafted quote. 2 pages
Daywork is a method of valuing construction work according to the time spent carrying out work together with the value of the plant and materials resources used. It is an alternative to valuing work by measurement. This guidance outlines when daywork can be charged, how it can be calculated and administration. This guidance is available for pdf download only. 4 pages
The reliance by the scaffolding contractor, on the skill and expertise of their operatives, will not relieve them of their responsibility for the adequacy of the design. This guidance outlines design criteria, training needs, insurance, ownership/copyright and common misconceptions when utilising a designer for scaffolding. 4 pages
Please enter a postcode to search for a member:
Please complete the fields below: