£19.70
This safety guidance note provides guidance for the UK scaffolding industry on the selection, safe erection, alteration, and dismantling of scaffold component guardrails, constructed in tube & fitting to provide edge protection to Class A and B surfaces. It should be read in conjunction with TG1 Temporary Edge Protection, which has been recently released.
This product is available in PDF format only.
16 pages
This document is intended to provide guidance to persons that are involved in the planning, management, supervision and use of lifting equipment and accessories for lifting. Gin wheels, mobile cranes and accessories for dangerous areas faced on site.
The Health & Safety at Work Act 1974 requires that employers give all employees sufficient information, training & supervision as is necessary for their Health & Safety. A broad guidance reminding us to ensure good preparation and emphasising to employees the areas of responsibility we all have in working safely. 4 pages
This NASC guidance note has been written to reflect the Control of Asbestos Regulations 2012 and has been produced following consultation and advice from the Asbestos Licensing Unit (ALU). (ACOP Ref: Managing and working with Asbestos – Control of Asbestos Regulations 2012 – L143 and follows ALG Memo 01/10 Ancillary asbestos licenses for scaffolding.) This product is available in PDF format only. 8 pages
The ‘good practice’ document has been produced by the NASC, it is a completely updated version. It provides guidance for scaffolders on the planning and safe use of construction hoists, including transport platforms, used for moving scaffolding materials during the erection and dismantling of scaffolding. 32 pages. This guidance is available for pdf download only.
Please enter a postcode to search for a member:
Please complete the fields below: