£14.00
The Handover Certificate will advise the client that at the time of the handover, the scaffold has been built to the required specification, it was suitable for the duty intended, it complies with the requirements of the Statutory Regulations, was structurally sound and in a safe condition for use.
This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
Initially there is no structure in place against which the scaffold can be tied. The scaffold may surround a structure, but it is still vital that measures to ensure stability are incorporated. Accordingly the initial stability of the scaffold structure must be achieved by means other than ties. Design input is still critical. 8 pages
The NASC are committed to involving everyone in health and safety matters whether on construction sites or in the office. To effect a change we must consider our workforce and consult with all those involved in a project, listening to and where necessary acting upon the views of the workforce. 8 pages
Booklet 110 pages Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
Please enter a postcode to search for a member:
Please complete the fields below: