£14.00
The Handover Certificate will advise the client that at the time of the handover, the scaffold has been built to the required specification, it was suitable for the duty intended, it complies with the requirements of the Statutory Regulations, was structurally sound and in a safe condition for use.
Booklet 110 pages Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
The legal requirement for rescue is specified in the ‘Work at Height Regulations 2005’ and require every employer in selecting work equipment for use in work at height to take account of the need for easy and timely evacuation and rescue in an emergency. 11 pages
Substance abuse affects the functioning of both body and mind and can increase the chance of having or causing an accident. The damaging health effects of substance abuse may increase when combined with exposure to hazardous substances in the workplace. 8 pages
This document gives scaffolding companies and clients guidance on The Work at Height Regulations 2005 (WAHR 2005) relating to safe means of access to and from scaffolding working platforms. The Construction (Design and Management) Regulations (CDM) outline that clients, principal designers, principal contractors, designers and contractors should consider what form of access may be needed at the planning stage. This should include any emergency escape routes that have been identified by the risk assessment, the preferred option for access / egress and the required number of access points. On larger projects powered passenger / goods hoists may be a safer option if available. Where passenger hoists are used, an additional means of access will be required for emergency purposes (e.g. in the event of a fire or mechanical failure). This update is significant in that key changes are ‘Ladder Safety’ and ‘Security’ of access onto scaffolds that differs to the earlier SG25:14. 16 pages
Please enter a postcode to search for a member:
Please complete the fields below: