£10.25
New NASC guidance note released in 2014.
8 pages
The Handover Certificate will advise the client that at the time of the handover, the scaffold has been built to the required specification, it was suitable for the duty intended, it complies with the requirements of the Statutory Regulations, was structurally sound and in a safe condition for use.
This guidance outlines how employers should complete their risk assessments as required by the Management of Health and Safety at Work Regulations. As employers you must carry out an assessment to identify the hazards, evaluate the risks to employees and identify any control measures which should be implemented. 16 pages
This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
Due to the nature of their work, scaffolders need to carefully consider any work that will be carried out in the vicinity of overhead power lines. This guidance enables operatives to understand the various hazards when working around overhead power lines and the procedures for applying safe working practices and earthing scaffold structures. 12 pages
Please enter a postcode to search for a member:
Please complete the fields below: