£19.70
This NASC guidance document has been produced to give an overview of the planning required and the range of precautions that need to be considered to eliminate the risk of harm including that of controlling the risk of falling material and transport accidents.
23 pages
This guidance is PDF only.
The Handover Certificate will advise the client that at the time of the handover, the scaffold has been built to the required specification, it was suitable for the duty intended, it complies with the requirements of the Statutory Regulations, was structurally sound and in a safe condition for use.
This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
The purpose of a brickguard is to prevent materials from falling off the working platform of the scaffold where toeboards do not offer sufficient protection. The inclusion or omission of brickguards should be considered when discussing the contract. 4 pages
The SG6 manual handling video can now be viewed free of charge on the NASC website here: https://nasc.org.uk/information/sg6-video/
Please enter a postcode to search for a member:
Please complete the fields below: