The purpose of this guidance is to provide guidance on the management of long-standing scaffolding structures. Throughout the industry scaffolds are erected to provide long-term access requirements and often remain in position for many months or even years, for example temporary yard sheds, scaffolding material racking systems, maintenance scaffolds etc.
The purpose of a brickguard is to prevent materials from falling off the working platform of the scaffold where toeboards do not offer sufficient protection. The inclusion or omission of brickguards should be considered when discussing the contract. 4 pages
This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
This NASC guidance note has been written to reflect the Control of Asbestos Regulations 2012 and has been produced following consultation and advice from the Asbestos Licensing Unit (ALU). (ACOP Ref: Managing and working with Asbestos – Control of Asbestos Regulations 2012 – L143 and follows ALG Memo 01/10 Ancillary asbestos licenses for scaffolding.) This product is available in PDF format only. 8 pages
Due to the nature of their work, scaffolders need to carefully consider any work that will be carried out in the vicinity of overhead power lines. This guidance enables operatives to understand the various hazards when working around overhead power lines and the procedures for applying safe working practices and earthing scaffold structures. 12 pages