£7.65
Many scaffolding contractors are unaware of the requirements of BS 5975:2019, ‘Code of practice for temporary works procedures and permissible stress design of falsework’, which contains information regarding procedural controls for the management of temporary works. These controls not only apply to falsework, but also to all types of scaffolding. Whilst BS 5975 is not a legal requirement, it is often used by Health and Safety Executive (HSE) inspectors, when visiting sites, as the expected benchmark for appropriate controls required for the management of temporary works on site.
The NASC has therefore produced a brief, simple and concise guide to assist scaffolding contractors and others involved with the delivery and management of temporary works. This includes an outline of the requirements and how they can be simply and practically achieved.
This guidance is available for pdf download only.
SG6:22 User Guide (pocket-sized). Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
The Handover Certificate will advise the client that at the time of the handover, the scaffold has been built to the required specification, it was suitable for the duty intended, it complies with the requirements of the Statutory Regulations, was structurally sound and in a safe condition for use.
This NASC guidance note has been written to reflect the Control of Asbestos Regulations 2012 and has been produced following consultation and advice from the Asbestos Licensing Unit (ALU). (ACOP Ref: Managing and working with Asbestos – Control of Asbestos Regulations 2012 – L143 and follows ALG Memo 01/10 Ancillary asbestos licenses for scaffolding.) This product is available in PDF format only. 8 pages
The SG6 manual handling video can now be viewed free of charge on the NASC website here: https://nasc.org.uk/information/sg6-video/
Please enter a postcode to search for a member:
Please complete the fields below: