The guidance looks at common weather conditions affecting scaffolding, planning for weather-related challenges, security of material and PPE requirements. It considers scaffolding in the sun and in cold or wet conditions.
This guidance document is 18 pages.
This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
This revision has been a fine-tuned following a systematic review of the guidance and understanding the realisation of substantial health and safety improvements in work areas previously targeted. The core principles of SG4 remain unchanged, albeit with continued emphasis on the 'Scaffolders' Safe Zone' method of working. To get the summary of changes to SG4, go to https://nasc.org.uk/wp-content/uploads/2024/05/Changes-to-SG4.docx 61 pages. This guidance is available for pdf download only.
This guidance outlines how employers should complete a COSHH assessment. As employers you must carry out an assessment and identify any control measures which should be implemented. Remember you are assessing the activity being carried out using the substance and not just the substance alone! 16 pages
Due to the nature of their work, scaffolders need to carefully consider any work that will be carried out in the vicinity of overhead power lines. This guidance enables operatives to understand the various hazards when working around overhead power lines and the procedures for applying safe working practices and earthing scaffold structures. 12 pages