£17.00
Due to the nature of their work, scaffolders need to carefully consider any work that will be carried out in the vicinity of overhead power lines. This guidance enables operatives to understand the various hazards when working around overhead power lines and the procedures for applying safe working practices and earthing scaffold structures.
12 pages
Initially there is no structure in place against which the scaffold can be tied. The scaffold may surround a structure, but it is still vital that measures to ensure stability are incorporated. Accordingly the initial stability of the scaffold structure must be achieved by means other than ties. Design input is still critical. 8 pages
The legal requirement for rescue is specified in the ‘Work at Height Regulations 2005’ and require every employer in selecting work equipment for use in work at height to take account of the need for easy and timely evacuation and rescue in an emergency. 11 pages
The ‘good practice’ document has been produced by the NASC, it is a completely updated version. It provides guidance for scaffolders on the planning and safe use of construction hoists, including transport platforms, used for moving scaffolding materials during the erection and dismantling of scaffolding. 32 pages. This guidance is available for pdf download only.
This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
Please enter a postcode to search for a member:
Please complete the fields below: