£6.55
This guidance explains the increasingly common Early Payment Schemes, offered my main contractors to provide shorter payment terms in return for a discount on amounts charged. It provides information from the point of view of the sub-contractor, enabling them to make more reasoned decisions that best suit their company.
This guidance note relates to schedules intended to be used for the valuation of additional work and/or variations to existing lump sum contracts. For the avoidance of doubt this guidance note does not relate to schedules of rates used in connection with contracts which are re-measured as the works proceed. This guidance is available for pdf download only.
Daywork is a method of valuing construction work according to the time spent carrying out work together with the value of the plant and materials resources used. It is an alternative to valuing work by measurement. This guidance outlines when daywork can be charged, how it can be calculated and administration. This guidance is available for pdf download only. 4 pages
The reliance by the scaffolding contractor, on the skill and expertise of their operatives, will not relieve them of their responsibility for the adequacy of the design. This guidance outlines design criteria, training needs, insurance, ownership/copyright and common misconceptions when utilising a designer for scaffolding. 4 pages
Generally written contracts specify a date for completion of the works. Whichever method is used failure to complete the work by the specified date may leave the scaffolder open to employer's claims. This guidance outlines the circumstances and how different situations can be managed. 2 pages
Please enter a postcode to search for a member: