£19.70
This safety guidance note provides guidance for the UK scaffolding industry on the selection, safe erection, alteration, and dismantling of scaffold component guardrails, constructed in tube & fitting to provide edge protection to Class A and B surfaces. It should be read in conjunction with TG1 Temporary Edge Protection, which has been recently released.
This product is available in PDF format only.
16 pages
The SG6 manual handling video can now be viewed free of charge on the NASC website here: https://nasc.org.uk/information/sg6-video/
Employers are responsible for establishing an inspection regime for the inspection of fall protection equipment that is produced and implemented by a competent person. A Register of equipment should be compiled for use in managing the inspection regime.
8 pages
This NASC guidance note has been written to reflect the Control of Asbestos Regulations 2012 and has been produced following consultation and advice from the Asbestos Licensing Unit (ALU). (ACOP Ref: Managing and working with Asbestos – Control of Asbestos Regulations 2012 – L143 and follows ALG Memo 01/10 Ancillary asbestos licenses for scaffolding.) This product is available in PDF format only. 8 pages
This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
Please enter a postcode to search for a member:
Please complete the fields below: