This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
This revision has been a fine-tuned following a systematic review of the guidance and understanding the realisation of substantial health and safety improvements in work areas previously targeted. The core principles of SG4 remain unchanged, albeit with continued emphasis on the 'Scaffolders' Safe Zone' method of working. To get the summary of changes to SG4, email healthandsafety@nasc.org.uk . 61 pages. This guidance is available for pdf download only.
The Health & Safety at Work Act 1974 requires that employers give all employees sufficient information, training & supervision as is necessary for their Health & Safety. A broad guidance reminding us to ensure good preparation and emphasising to employees the areas of responsibility we all have in working safely. 4 pages
The NASC are committed to involving everyone in health and safety matters whether on construction sites or in the office. To effect a change we must consider our workforce and consult with all those involved in a project, listening to and where necessary acting upon the views of the workforce. 8 pages
Initially there is no structure in place against which the scaffold can be tied. The scaffold may surround a structure, but it is still vital that measures to ensure stability are incorporated. Accordingly the initial stability of the scaffold structure must be achieved by means other than ties. Design input is still critical. 8 pages
The purpose of a brickguard is to prevent materials from falling off the working platform of the scaffold where toeboards do not offer sufficient protection. The inclusion or omission of brickguards should be considered when discussing the contract. 4 pages
This NASC guidance note has been written to reflect the Control of Asbestos Regulations 2012 and has been produced following consultation and advice from the Asbestos Licensing Unit (ALU). (ACOP Ref: Managing and working with Asbestos – Control of Asbestos Regulations 2012 – L143 and follows ALG Memo 01/10 Ancillary asbestos licenses for scaffolding.) This product is available in PDF format only. 8 pages