SG28:17 Safe Systems of Work for Scaffolding Associated with Timber Frame Building Construction

Initially there is no structure in place against which the scaffold can be tied. The scaffold may surround a structure, but it is still vital that measures to ensure stability are incorporated. Accordingly the initial stability of the scaffold structure must be achieved by means other than ties. Design input is still critical.

8 pages

SKU: SG28:17 Category:

Reviews

There are no reviews yet.

Be the first to review “SG28:17 Safe Systems of Work for Scaffolding Associated with Timber Frame Building Construction”

Your email address will not be published. Required fields are marked *

You may also like…

  • SG6:15 Manual Handling in the Scaffolding Industry

    Non-member price £ 17.00
    Member price £ 8.50
    More detailsAdd to Basket
  • SG16:14 Management of Fall Protection Equipment

    Non-member price £ 12.00
    Member price £ 6.00
    More detailsAdd to Basket
  • SG4:15 Preventing Falls in Scaffolding Operations

    Non-member price £ 40.00
    Member price £ 20.00
    More detailsAdd to Basket
  • SG7:19 Risk Assessments & Method Statements RAMS

    Non-member price £ 17.00
    Member price £ 8.50
    More detailsAdd to Basket