£19.70
This NASC guidance document has been produced to give an overview of the planning required and the range of precautions that need to be considered to eliminate the risk of harm including that of controlling the risk of falling material and transport accidents.
23 pages
This guidance is PDF only.
This revision has been a fine-tuned following a systematic review of the guidance and understanding the realisation of substantial health and safety improvements in work areas previously targeted. The core principles of SG4 remain unchanged, albeit with continued emphasis on the 'Scaffolders' Safe Zone' method of working. To get the summary of changes to SG4, go to https://nasc.org.uk/wp-content/uploads/2024/05/Changes-to-SG4.docx 61 pages. This guidance is available for pdf download only.
This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
The legal requirement for rescue is specified in the ‘Work at Height Regulations 2005’ and require every employer in selecting work equipment for use in work at height to take account of the need for easy and timely evacuation and rescue in an emergency. 11 pages
Please enter a postcode to search for a member:
Please complete the fields below: