£7.65
Many scaffolding contractors are unaware of the requirements of BS 5975:2019, ‘Code of practice for temporary works procedures and permissible stress design of falsework’, which contains information regarding procedural controls for the management of temporary works. These controls not only apply to falsework, but also to all types of scaffolding. Whilst BS 5975 is not a legal requirement, it is often used by Health and Safety Executive (HSE) inspectors, when visiting sites, as the expected benchmark for appropriate controls required for the management of temporary works on site.
The NASC has therefore produced a brief, simple and concise guide to assist scaffolding contractors and others involved with the delivery and management of temporary works. This includes an outline of the requirements and how they can be simply and practically achieved.
This guidance is available for pdf download only.
This document gives scaffolding companies and clients guidance on The Work at Height Regulations 2005 (WAHR 2005) relating to safe means of access to and from scaffolding working platforms. The Construction (Design and Management) Regulations (CDM) outline that clients, principal designers, principal contractors, designers and contractors should consider what form of access may be needed at the planning stage. This should include any emergency escape routes that have been identified by the risk assessment, the preferred option for access / egress and the required number of access points. On larger projects powered passenger / goods hoists may be a safer option if available. Where passenger hoists are used, an additional means of access will be required for emergency purposes (e.g. in the event of a fire or mechanical failure). This update is significant in that key changes are ‘Ladder Safety’ and ‘Security’ of access onto scaffolds that differs to the earlier SG25:14. 16 pages
The purpose of a brickguard is to prevent materials from falling off the working platform of the scaffold where toeboards do not offer sufficient protection. The inclusion or omission of brickguards should be considered when discussing the contract. 4 pages
This document includes simple changes in the requirements of reporting to be noted for your RIDDOR needs
4 pages
SG6:22 User Guide (pocket-sized). Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
Please enter a postcode to search for a member:
Please complete the fields below: