Many scaffolding contractors are unaware of the requirements of BS 5975:2019, ‘Code of practice for temporary works procedures and permissible stress design of falsework’, which contains information regarding procedural controls for the management of temporary works. These controls not only apply to falsework, but also to all types of scaffolding. Whilst BS 5975 is not a legal requirement, it is often used by Health and Safety Executive (HSE) inspectors, when visiting sites, as the expected benchmark for appropriate controls required for the management of temporary works on site.
The NASC has therefore produced a brief, simple and concise guide to assist scaffolding contractors and others involved with the delivery and management of temporary works. This includes an outline of the requirements and how they can be simply and practically achieved.
This guidance is available for pdf download only.
This document gives scaffolding companies and clients guidance on The Work at Height Regulations 2005 (WAHR 2005) relating to safe means of access to and from scaffolding working platforms. The Construction (Design and Management) Regulations (CDM) outline that clients, principal designers, principal contractors, designers and contractors should consider what form of access may be needed at the planning stage. This should include any emergency escape routes that have been identified by the risk assessment, the preferred option for access / egress and the required number of access points. On larger projects powered passenger / goods hoists may be a safer option if available. Where passenger hoists are used, an additional means of access will be required for emergency purposes (e.g. in the event of a fire or mechanical failure). This update is significant in that key changes are ‘Ladder Safety’ and ‘Security’ of access onto scaffolds that differs to the earlier SG25:14. 16 pages
The SG6 manual handling video can now be viewed free of charge on the NASC website here: https://nasc.org.uk/information/sg6-video/
Due to the nature of their work, scaffolders need to carefully consider any work that will be carried out in the vicinity of overhead power lines. This guidance enables operatives to understand the various hazards when working around overhead power lines and the procedures for applying safe working practices and earthing scaffold structures. 12 pages
This revision has been a fine-tuned following a systematic review of the guidance and understanding the realisation of substantial health and safety improvements in work areas previously targeted. The core principles of SG4 remain unchanged, albeit with continued emphasis on the 'Scaffolders' Safe Zone' method of working. To get the summary of changes to SG4, go to https://nasc.org.uk/wp-content/uploads/2024/05/Changes-to-SG4.docx 61 pages. This guidance is available for pdf download only.