£6.55
This guidance gives details of various methods available for satisfactorily securing scaffold boards to prevent movement. Users should satisfy themselves when/which boards require tying down and that any proprietary equipment or fixing method selected meets their requirements.
This product is available in PDF format only.
4 pages
A licence is required in order to erect a scaffold on or above the public highway. The licence is issued under section 169 of the Highways Act 1980, generally by the highway authority responsible for the particular stretch of highway. This guidance indicates the type of information that may be required. 2 pages
Other than for very small contracts most contracts of any size have a pre-contract meeting. The primary purpose of the meeting is often for the parties to clarify specific points in the enquiry and quotation. This guidance outlines items to be covered in the meeting, pitfalls and a recommended strategy. 2 pages
This guidance note sets out the information that the Scaffolding Company should seek from the Employer. This information will be used by the Scaffolding Company in order to produce their Quotation and will be the basis for their offer. It is important that the Scaffolding Contractor obtains as much information about the Project as possible prior to firming up their price in order to reduce the risk they are exposed to. 4 pages
The purpose of this guidance note is to bring together, in one document, some of the more common qualifications used by members. It is not suggested that the list is exhaustive or that the wording of individual clauses is appropriate to each and every similar situation. However, it may serve as a check list for estimators. 10 pages
A 32-page, full-colour pocket guide in A6 format. This document summarises clearly the requirements for TG20:21 compliant scaffolding and offers indispensable guidance to the scaffolding operative on-site. Price is £9.50 per copy for non-NASC members and £4.75 per copy for NASC members. Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
Many free-standing scaffolding structures, such as access towers, major signboards, fences and enclosures, need to be anchored to the ground, primarily to resist wind forces. Whilst all structures requiring restraint via anchoring to the ground should be subject to a bespoke design produced by a competent engineer, the guidance considers different types of anchors available and typical indicative holding capacities, the possibility of disturbing underground services, the use of guys and scaffold tube restraint. 6 pages
This document provides guidance for covering 50mm gaps in scaffold platforms through which standards protrude, as well as for covering larger gaps in decking which, due to width restrictions or obstructions, cannot be fully boarded in the conventional way. This guidance is PDF only.
Traditionally, flame retardant timber decking has long been a fundamental requirement for scaffolding in various sectors of the industry. However, in the light of the ‘Grenfell’ disaster, there has been a substantial increase in the number of contracts which specify the need for flame retardant scaffold boards. This document gives details of various fire retardant treatments available, the recommended specification and guidance for care and storage. This guidance is available for pdf download only. 2 pages.
Please enter a postcode to search for a member:
Please complete the fields below: