£6.55
This document provides guidance for covering 50mm gaps in scaffold platforms through which standards protrude, as well as for covering larger gaps in decking which, due to width restrictions or obstructions, cannot be fully boarded in the conventional way.
This guidance is PDF only.
A 32-page, full-colour pocket guide in A6 format. This document summarises clearly the requirements for TG20:21 compliant scaffolding and offers indispensable guidance to the scaffolding operative on-site. Price is £9.50 per copy for non-NASC members and £4.75 per copy for NASC members. Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
Aluminium tubes, prefabricated beams and other components are widely used throughout the scaffolding industry. Whilst aluminium is not as stiff as steel and will deflect more when subjected to equivalent loads, it is much lighter and provides great advantages with regard to manual handling or the reduction weight. As aluminium couplers are not readily available, aluminium tube and beams are invariably connected with steel couplers and joint pins. Unfortunately, when two dissimilar metals such as aluminium and steel are in contact, a phenomenon known as ‘galvanic corrosion’ can occur where the corrosion of one of the metals, in this case aluminium, can be greatly accelerated. In severe cases this could seriously affect the integrity of the scaffold structure.
Scaffold tube storage racks are a common feature of every scaffolding contractor’s yard and many long-term live sites. Whilst tube racks are usually constructed as basic birdcage-like structures, they generally support many tonnes of equipment, so their design needs special consideration. This guidance note considers the design, use and maintenance of scaffold tube storage racks. 6 pages
A temporary roof or building is a sheeted structure designed to protect the area inside from the effects of weather, dust, etc. This guide is intended to give design and construction information to the suppliers and erectors of temporary roofs and buildings and intended for use by contractors during the building process. 56 pages
Please enter a postcode to search for a member: