£100.00
The TG20 Operational Guide contains detailed practical guidance for most common types of scaffolding, supported by structural research and calculation. Guidance is provided for a range of standard structures which includes independent scaffolding, interior birdcages, chimney stack scaffolds, loading bays, ladder-access towers, free-standing towers, lift shaft towers, putlog scaffolding, exterior birdcages, tube and fitting mobile towers, tube and fitting loading bays without beams, and tied independent scaffolds with three inside boards.
NASC members can purchase 10 or more copies of the TG20:21 Operational Guide book at the discounted rate of £25 per unit. To do so, please email sales@nasc.org.uk
Traditionally, flame retardant timber decking has long been a fundamental requirement for scaffolding in various sectors of the industry. However, in the light of the ‘Grenfell’ disaster, there has been a substantial increase in the number of contracts which specify the need for flame retardant scaffold boards. This document gives details of various fire retardant treatments available, the recommended specification and guidance for care and storage. This guidance is available for pdf download only. 2 pages.
A temporary roof or building is a sheeted structure designed to protect the area inside from the effects of weather, dust, etc. This guide is intended to give design and construction information to the suppliers and erectors of temporary roofs and buildings and intended for use by contractors during the building process. 56 pages
BS2482:2009 defines both visual and machine strength grading standards for 38mm x 225mm boards supported at 1.2m spans and 63mm x 225mm boards supported at 2.5m spans; and machine strength grading standards only for 38mm x 225mm boards supported at 1.5m spans. This guidance is reviewed on the basis of removing A grade boards that should not exist. A visually graded board is still a BS2482 product and should be marked as such on the end band. 6 pages
This guide is intended to aid those who commission scaffold designs by summarising the responsibilities of each party involved at each stage of the process. It also details the requirements for preparing a design brief with information required by the Designer to enable a suitable and sufficient design to be produced, as well as outlining the design process, checking requirements and expected output information. This document is complimented by CG6: Scaffold Design. 6 pages.
Please enter a postcode to search for a member:
Please complete the fields below: