£20.00
Aluminium tubes, prefabricated beams and other components are widely used throughout the scaffolding industry. Whilst aluminium is not as stiff as steel and will deflect more when subjected to equivalent loads, it is much lighter and provides great advantages with regard to manual handling or the reduction weight. As aluminium couplers are not readily available, aluminium tube and beams are invariably connected with steel couplers and joint pins. Unfortunately, when two dissimilar metals such as aluminium and steel are in contact, a phenomenon known as ‘galvanic corrosion’ can occur where the corrosion of one of the metals, in this case aluminium, can be greatly accelerated. In severe cases this could seriously affect the integrity of the scaffold structure.
This guide is intended to aid those who commission scaffold designs by summarising the responsibilities of each party involved at each stage of the process. It also details the requirements for preparing a design brief with information required by the Designer to enable a suitable and sufficient design to be produced, as well as outlining the design process, checking requirements and expected output information. This document is complimented by CG6: Scaffold Design. 6 pages.
TG4:19 had amendments predominantly in relation to the orientation of ring bolts where current thinking is that settlement is probably greater than side wind loads so reduces potential shear loads on the bolt. Other minor changes were cosmetic. A recent update in April 2019 saw the removal of one reference only when the guidance was reissued as TG4:19. 24 pages
This guidance note is concerned with advice for the safe erection, use and dismantling of temporary suspended chutes intended for the conveyance of waste construction materials. The guidance covers chutes constructed of detachable sections made of metal or non-metallic material, attached to scaffolding. 4 pages
Please enter a postcode to search for a member:
Please complete the fields below: