£18.00
TG4:19 had amendments predominantly in relation to the orientation of ring bolts where current thinking is that settlement is probably greater than side wind loads so reduces potential shear loads on the bolt. Other minor changes were cosmetic. A recent update in April 2019 saw the removal of one reference only when the guidance was reissued as TG4:19.
24 pages
The full suite of publications includes the following: TG20:13 eGuide software, TG20:13 Design Guide (206 pages), TG20:13 Operational Guide (226 pages) and TG20 Pocket Guide (32 pages). To buy the TG20:13 eGuide on its own, you need to have purchased the TG20:13 Full Suite before. The TG20:13 eGuide may only be used on one PC/laptop/Android device at any given time. Price shown includes VAT and £12 P&P.
A temporary roof or building is a sheeted structure designed to protect the area inside from the effects of weather, dust, etc. This guide is intended to give design and construction information to the suppliers and erectors of temporary roofs and buildings and intended for use by contractors during the building process. 56 pages
This guide is intended to aid those who commission scaffold designs by summarising the responsibilities of each party involved at each stage of the process. It also details the requirements for preparing a design brief with information required by the Designer to enable a suitable and sufficient design to be produced, as well as outlining the design process, checking requirements and expected output information. This document is complimented by CG6: Scaffold Design. 6 pages.
This guidance identifies the specification and test requirements and minimum markings to be found on all EN74-1 scaffold fittings. The 2015 update sees no change other than dates. EN74-1 is unlikely to change in the next four years.
2 pages
Please enter a postcode to search for a member: