£6.00
When in use, scaffold boards are often subjected to harsh conditions and mistreatment and may deteriorate to such an extent that they become unsafe. To ensure that they remain in a safe and serviceable condition, they should be subjected to regular inspections/checks and where necessary repaired/refurbished to ensure that they remain fit for purpose. This document provides guidance on the inspection, care and maintenance of scaffold boards to maximise their operational service life.
This guidance is available for pdf download only.
BS2482:2009 defines both visual and machine strength grading standards for 38mm x 225mm boards supported at 1.2m spans and 63mm x 225mm boards supported at 2.5m spans; and machine strength grading standards only for 38mm x 225mm boards supported at 1.5m spans. This guidance is reviewed on the basis of removing A grade boards that should not exist. A visually graded board is still a BS2482 product and should be marked as such on the end band. 6 pages
A temporary roof or building is a sheeted structure designed to protect the area inside from the effects of weather, dust, etc. This guide is intended to give design and construction information to the suppliers and erectors of temporary roofs and buildings and intended for use by contractors during the building process. 56 pages
This document provides guidance for covering 50mm gaps in scaffold platforms through which standards protrude, as well as for covering larger gaps in decking which, due to width restrictions or obstructions, cannot be fully boarded in the conventional way. This guidance is PDF only.
Scaffold tube storage racks are a common feature of every scaffolding contractor’s yard and many long-term live sites. Whilst tube racks are usually constructed as basic birdcage-like structures, they generally support many tonnes of equipment, so their design needs special consideration. This guidance note considers the design, use and maintenance of scaffold tube storage racks. 6 pages
This guide is intended to aid those who commission scaffold designs by summarising the responsibilities of each party involved at each stage of the process. It also details the requirements for preparing a design brief with information required by the Designer to enable a suitable and sufficient design to be produced, as well as outlining the design process, checking requirements and expected output information. This document is complimented by CG6: Scaffold Design. 6 pages.
Please enter a postcode to search for a member: