£19.70
This safety guidance note provides guidance for the UK scaffolding industry on the selection, safe erection, alteration, and dismantling of scaffold component guardrails, constructed in tube & fitting to provide edge protection to Class A and B surfaces. It should be read in conjunction with TG1 Temporary Edge Protection, which has been recently released.
This product is available in PDF format only.
16 pages
This document includes simple changes in the requirements of reporting to be noted for your RIDDOR needs
4 pages
This document gives scaffolding companies and clients guidance on The Work at Height Regulations 2005 (WAHR 2005) relating to safe means of access to and from scaffolding working platforms. The Construction (Design and Management) Regulations (CDM) outline that clients, principal designers, principal contractors, designers and contractors should consider what form of access may be needed at the planning stage. This should include any emergency escape routes that have been identified by the risk assessment, the preferred option for access / egress and the required number of access points. On larger projects powered passenger / goods hoists may be a safer option if available. Where passenger hoists are used, an additional means of access will be required for emergency purposes (e.g. in the event of a fire or mechanical failure). This update is significant in that key changes are ‘Ladder Safety’ and ‘Security’ of access onto scaffolds that differs to the earlier SG25:14. 16 pages
Booklet 110 pages Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
The Handover Certificate will advise the client that at the time of the handover, the scaffold has been built to the required specification, it was suitable for the duty intended, it complies with the requirements of the Statutory Regulations, was structurally sound and in a safe condition for use.
Please enter a postcode to search for a member:
Please complete the fields below: