This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
This revision has been a fine-tuned following a systematic review of the guidance and understanding the realisation of substantial health and safety improvements in work areas previously targeted. The core principles of SG4 remain unchanged, albeit with continued emphasis on the 'Scaffolders' Safe Zone' method of working. To get the summary of changes to SG4, go to https://nasc.org.uk/wp-content/uploads/2024/05/Changes-to-SG4.docx 61 pages. This guidance is available for pdf download only.
The Health & Safety at Work Act 1974 requires that employers give all employees sufficient information, training & supervision as is necessary for their Health & Safety. A broad guidance reminding us to ensure good preparation and emphasising to employees the areas of responsibility we all have in working safely. 4 pages
This guidance outlines how employers should complete a COSHH assessment. As employers you must carry out an assessment and identify any control measures which should be implemented. Remember you are assessing the activity being carried out using the substance and not just the substance alone! 16 pages
This document gives scaffolding companies and clients guidance on The Work at Height Regulations 2005 (WAHR 2005) relating to safe means of access to and from scaffolding working platforms. The Construction (Design and Management) Regulations (CDM) outline that clients, principal designers, principal contractors, designers and contractors should consider what form of access may be needed at the planning stage. This should include any emergency escape routes that have been identified by the risk assessment, the preferred option for access / egress and the required number of access points. On larger projects powered passenger / goods hoists may be a safer option if available. Where passenger hoists are used, an additional means of access will be required for emergency purposes (e.g. in the event of a fire or mechanical failure). This update is significant in that key changes are ‘Ladder Safety’ and ‘Security’ of access onto scaffolds that differs to the earlier SG25:14. 16 pages
This NASC guidance note has been written to reflect the Control of Asbestos Regulations 2012 and has been produced following consultation and advice from the Asbestos Licensing Unit (ALU). (ACOP Ref: Managing and working with Asbestos – Control of Asbestos Regulations 2012 – L143 and follows ALG Memo 01/10 Ancillary asbestos licenses for scaffolding.) This product is available in PDF format only. 8 pages
The ‘good practice’ document has been produced by the NASC, it is a completely updated version. It provides guidance for scaffolders on the planning and safe use of construction hoists, including transport platforms, used for moving scaffolding materials during the erection and dismantling of scaffolding. 32 pages. This guidance is available for pdf download only.