£7.65
Where it is not reasonably practicable to avoid entering a confined space to undertake work, the employer or self-employed person is responsible for ensuring that a safe system of work is used. This recently updated guidance outlines the hazards associated with Confined Space Entry.
7 pages
The legal requirement for rescue is specified in the ‘Work at Height Regulations 2005’ and require every employer in selecting work equipment for use in work at height to take account of the need for easy and timely evacuation and rescue in an emergency. 11 pages
Employers are responsible for establishing an inspection regime for the inspection of fall protection equipment that is produced and implemented by a competent person. A Register of equipment should be compiled for use in managing the inspection regime.
8 pages
This revision has been a fine-tuned following a systematic review of the guidance and understanding the realisation of substantial health and safety improvements in work areas previously targeted. The core principles of SG4 remain unchanged, albeit with continued emphasis on the 'Scaffolders' Safe Zone' method of working. To get the summary of changes to SG4, email healthandsafety@nasc.org.uk . 61 pages. This guidance is available for pdf download only.
The purpose of a brickguard is to prevent materials from falling off the working platform of the scaffold where toeboards do not offer sufficient protection. The inclusion or omission of brickguards should be considered when discussing the contract. 4 pages
This guidance note has been revised to take account of the changes in the Noise at Work Regulations. The erection and dismantling of scaffolding can create quite high levels of noise. The general moving and storage of scaffolding materials can be quite noisy and other related activities such as abrasive wheel cutters, bench mounted circular saws and drills all generate noise levels that could be detrimental to health that may require the employer to provide hearing protection and the employees to use it correctly.
This document includes simple changes in the requirements of reporting to be noted for your RIDDOR needs
4 pages
Initially there is no structure in place against which the scaffold can be tied. The scaffold may surround a structure, but it is still vital that measures to ensure stability are incorporated. Accordingly the initial stability of the scaffold structure must be achieved by means other than ties. Design input is still critical. 8 pages
Please enter a postcode to search for a member: