£7.65
Whilst there is no statutory requirement for a scaffold contractor to issue a handover certificate, clients may, in their own interest, and a recommendation by the NASC that the scaffold contractor issues a handover certificate to their client. This guidance is available for pdf download only.
2 pages
This revision has been a fine-tuned following a systematic review of the guidance and understanding the realisation of substantial health and safety improvements in work areas previously targeted. The core principles of SG4 remain unchanged, albeit with continued emphasis on the 'Scaffolders' Safe Zone' method of working. To get the summary of changes to SG4, email healthandsafety@nasc.org.uk . 61 pages. This guidance is available for pdf download only.
The SG6 manual handling video can now be viewed free of charge on the NASC website here: https://nasc.org.uk/information/sg6-video/
More than a quarter of the accidents reported each year by NASC members to enforcing authorities are associated with manual handling – the transporting or supporting of loads by hand, or by bodily force. A well-established document that proved to still be robust and valid. This revised guidance focuses on the management of manual handling and includes the Health & Safety Executive (HSE) Manual handling assessment charts (MAC tool) – helps assess the risks posed by lifting, carrying and team manual handling activities. The MAC tool also assists the assessor to understand, interpret and categorise the level of risk of the various known risk factors associated with these activities. It also has a numerical and colour coding score system to highlight high-risk manual handling tasks. An example of Manual Handling Risk Assessment form is included. 16 pages.
SG6:22 User Guide (pocket-sized). Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
This document gives scaffolding companies and clients guidance on The Work at Height Regulations 2005 (WAHR 2005) relating to safe means of access to and from scaffolding working platforms. The Construction (Design and Management) Regulations (CDM) outline that clients, principal designers, principal contractors, designers and contractors should consider what form of access may be needed at the planning stage. This should include any emergency escape routes that have been identified by the risk assessment, the preferred option for access / egress and the required number of access points. On larger projects powered passenger / goods hoists may be a safer option if available. Where passenger hoists are used, an additional means of access will be required for emergency purposes (e.g. in the event of a fire or mechanical failure). This update is significant in that key changes are ‘Ladder Safety’ and ‘Security’ of access onto scaffolds that differs to the earlier SG25:14. 16 pages
Please enter a postcode to search for a member: