£5.45
Traditionally, flame retardant timber decking has long been a fundamental requirement for scaffolding in various sectors of the industry. However, in the light of the ‘Grenfell’ disaster, there has been a substantial increase in the number of contracts which specify the need for flame retardant scaffold boards.
This document gives details of various fire retardant treatments available, the recommended specification and guidance for care and storage. This guidance is available for pdf download only.
2 pages.
The effects of heat on scaffolding equipment can have a significant and permanent effect on its strength and performance. This guidance explains the potential issues and the action to be taken if equipment has been subjected to a fire or similar conditions. This guidance is available for pdf download only.
Please note - this guide is on back order as of 31 July 2024. We are waiting for a reprint and will send them out ASAP. The TG20 Operational Guide contains detailed practical guidance for most common types of scaffolding, supported by structural research and calculation. Guidance is provided for a range of standard structures which includes independent scaffolding, interior birdcages, chimney stack scaffolds, loading bays, ladder-access towers, free-standing towers, lift shaft towers, putlog scaffolding, exterior birdcages, tube and fitting mobile towers, tube and fitting loading bays without beams, and tied independent scaffolds with three inside boards. NASC members can purchase 10 or more copies of the TG20:21 Operational Guide book at the discounted rate of £25 per unit. To do so, please email sales@nasc.org.uk
Scaffold tube storage racks are a common feature of every scaffolding contractor’s yard and many long-term live sites. Whilst tube racks are usually constructed as basic birdcage-like structures, they generally support many tonnes of equipment, so their design needs special consideration. This guidance note considers the design, use and maintenance of scaffold tube storage racks. 6 pages
TG20 provides the definitive guidance for scaffolding constructed with tube and fittings throughout the UK. TG20:21 builds on TG20:13, and makes the eGuide software, Design Guide and Operational Guide available via the new NASC ePortal, on a subscription basis. The eGuide produces pdf compliance sheets, which now include more information and an illustration. The guides are fully searchable online. The ePortal is available here from computers, tablets and smart phones via web browsers. Each subscription gives access from multiple machines, but only one machine at a time. Purchase and use of a subscription implies acceptance of the subscription agreement, found here, by all users. The price shown excludes VAT at 20%. If you are renewing an existing TG20:21 subscription please enter the serial number below and press Verify before adding to basket.
This document provides guidance for covering 50mm gaps in scaffold platforms through which standards protrude, as well as for covering larger gaps in decking which, due to width restrictions or obstructions, cannot be fully boarded in the conventional way. This guidance is PDF only.
Please enter a postcode to search for a member:
Please complete the fields below: