£5.45
Traditionally, flame retardant timber decking has long been a fundamental requirement for scaffolding in various sectors of the industry. However, in the light of the ‘Grenfell’ disaster, there has been a substantial increase in the number of contracts which specify the need for flame retardant scaffold boards.
This document gives details of various fire retardant treatments available, the recommended specification and guidance for care and storage. This guidance is available for pdf download only.
2 pages.
The effects of heat on scaffolding equipment can have a significant and permanent effect on its strength and performance. This guidance explains the potential issues and the action to be taken if equipment has been subjected to a fire or similar conditions. This guidance is available for pdf download only.
This guidance gives details of the stress corrosion cracking (SCC) that can occur in certain materials when subjected to tensile stress and specific corrosive environments. Although rare in our industry, it can lead to unexpected sudden failure of certain metals. Whilst chemical environments and alloys are highly specific, this guidance explains the process by which SCC can occur and advises that specialist advice may be needed where SCC is possible or has occurred in the past. This guidance is available for pdf download only.
2 pages
In order to be able to visually identify EN74 certified couplers, this guidance document identifies the specification and minimum markings to be found on all EN74-1:2005 and EN74-1:2022 scaffold couplers, together with brief details regarding the differences between the two standards. This product is available in PDF format only.
The TG20 Design Guide provides technical data, commentary, and source material for use by competent and suitably qualified scaffold designers in circumstances which are outside the scope of standard solutions provided in the TG20 Operational Guide and TG20 e-Guide software. NASC members can purchase 10 or more copies of the TG20:21 Design Guide book at the discounted rate of £25 per unit. To do so, please email sales@nasc.org.uk
This guide is intended to aid those who commission scaffold designs by summarising the responsibilities of each party involved at each stage of the process. It also details the requirements for preparing a design brief with information required by the Designer to enable a suitable and sufficient design to be produced, as well as outlining the design process, checking requirements and expected output information. This document is complimented by CG6: Scaffold Design. 6 pages.
Please enter a postcode to search for a member: