This guidance gives details of various methods available for satisfactorily securing scaffold boards to prevent movement. Users should satisfy themselves when/which boards require tying down and that any proprietary equipment or fixing method selected meets their requirements.
This product is available in PDF format only.
4 pages
This guidance note sets out the information that the Scaffolding Company should seek from the Employer. This information will be used by the Scaffolding Company in order to produce their Quotation and will be the basis for their offer. It is important that the Scaffolding Contractor obtains as much information about the Project as possible prior to firming up their price in order to reduce the risk they are exposed to. 4 pages
Other than for very small contracts most contracts of any size have a pre-contract meeting. The primary purpose of the meeting is often for the parties to clarify specific points in the enquiry and quotation. This guidance outlines items to be covered in the meeting, pitfalls and a recommended strategy. 2 pages
A licence is required in order to erect a scaffold on or above the public highway. The licence is issued under section 169 of the Highways Act 1980, generally by the highway authority responsible for the particular stretch of highway. This guidance indicates the type of information that may be required. 2 pages
The purpose of this guidance note is to bring together, in one document, some of the more common qualifications used by members. It is not suggested that the list is exhaustive or that the wording of individual clauses is appropriate to each and every similar situation. However, it may serve as a check list for estimators. 10 pages
This guidance note is concerned with advice for the safe erection, use and dismantling of temporary suspended chutes intended for the conveyance of waste construction materials. The guidance covers chutes constructed of detachable sections made of metal or non-metallic material, attached to scaffolding. 4 pages
A 32-page, full-colour pocket guide in A6 format. This document summarises clearly the requirements for TG20:21 compliant scaffolding and offers indispensable guidance to the scaffolding operative on-site. Price is £9.50 per copy for non-NASC members and £4.75 per copy for NASC members. Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
TG20 provides the definitive guidance for scaffolding constructed with tube and fittings throughout the UK. TG20:21 builds on TG20:13, and makes the eGuide software, Design Guide and Operational Guide available via the new NASC ePortal, on a subscription basis. The eGuide produces pdf compliance sheets, which now include more information and an illustration. The guides are fully searchable online. The ePortal is available here from computers, tablets and smart phones via web browsers. Each subscription gives access from multiple machines, but only one machine at a time. Purchase and use of a subscription implies acceptance of the subscription agreement, found here, by all users. The price shown excludes VAT at 20%. If you are renewing an existing TG20:21 subscription please enter the serial number below and press Verify before adding to basket.
Many free-standing scaffolding structures, such as access towers, major signboards, fences and enclosures, need to be anchored to the ground, primarily to resist wind forces. Whilst all structures requiring restraint via anchoring to the ground should be subject to a bespoke design produced by a competent engineer, the guidance considers different types of anchors available and typical indicative holding capacities, the possibility of disturbing underground services, the use of guys and scaffold tube restraint. 6 pages