£7.65
Scaffold tube storage racks are a common feature of every scaffolding contractor’s yard and many long-term live sites. Whilst tube racks are usually constructed as basic birdcage-like structures, they generally support many tonnes of equipment, so their design needs special consideration. This guidance note considers the design, use and maintenance of scaffold tube storage racks.
6 pages
This guidance note is concerned with advice for the safe erection, use and dismantling of temporary suspended chutes intended for the conveyance of waste construction materials. The guidance covers chutes constructed of detachable sections made of metal or non-metallic material, attached to scaffolding. 4 pages
Scaffold board nailplates are specially stamped toothed strips of galvanised steel that can be applied to new or used boards to prevent or to repair existing end splits. Experience gained over many years by the scaffold industry indicates that the service life of a board can be substantially extended if nailplates are fitted. This revised and updated version contains additional information and guidance on the specification and fitting of nailplates.
2 pages
A 32-page, full-colour pocket guide in A6 format. This document summarises clearly the requirements for TG20:21 compliant scaffolding and offers indispensable guidance to the scaffolding operative on-site. Price is £9.50 per copy for non-NASC members and £4.75 per copy for NASC members. Members wishing to place an order for 100+ copies must email sales@nasc.org.uk as further discounts apply.
TG4:19 had amendments predominantly in relation to the orientation of ring bolts where current thinking is that settlement is probably greater than side wind loads so reduces potential shear loads on the bolt. Other minor changes were cosmetic. A recent update in April 2019 saw the removal of one reference only when the guidance was reissued as TG4:19. 24 pages
Please enter a postcode to search for a member:
Please complete the fields below: