£7.65
This guidance note is concerned with advice for the safe erection, use and dismantling of temporary suspended chutes intended for the conveyance of waste construction materials. The guidance covers chutes constructed of detachable sections made of metal or non-metallic material, attached to scaffolding.
4 pages
The purpose of this guidance note is to bring together, in one document, some of the more common qualifications used by members. It is not suggested that the list is exhaustive or that the wording of individual clauses is appropriate to each and every similar situation. However, it may serve as a check list for estimators. 10 pages
This is an instruction manual for managing a project and relies on knowledge, skill and expertise to operate it. The mechanisms have to be understood and complied with. Those intending to subcontract under this form should, as a minimum, obtain and read the form and its associated guidance notes. 8 pages
Other than for very small contracts most contracts of any size have a pre-contract meeting. The primary purpose of the meeting is often for the parties to clarify specific points in the enquiry and quotation. This guidance outlines items to be covered in the meeting, pitfalls and a recommended strategy. 2 pages
Daywork is a method of valuing construction work according to the time spent carrying out work together with the value of the plant and materials resources used. It is an alternative to valuing work by measurement. This guidance outlines when daywork can be charged, how it can be calculated and administration. This guidance is available for pdf download only. 4 pages
This guidance explains the differences between ‘supplementary’ and ‘check’ couplers and gives typical design applications where high coupler forces could be expected and where additional loadbearing capacity to connections may be required. It also contains guidance on coupler configurations and expected safe working loads (SWLs) where supplementary couplers are used. To ensure that SWL values are as accurate as possible, data provided within this document is based on practical testing rather than calculation. 2 pages
TG4:19 had amendments predominantly in relation to the orientation of ring bolts where current thinking is that settlement is probably greater than side wind loads so reduces potential shear loads on the bolt. Other minor changes were cosmetic. A recent update in April 2019 saw the removal of one reference only when the guidance was reissued as TG4:19. 24 pages
In order to be able to visually identify EN74 certified couplers, this guidance document identifies the specification and minimum markings to be found on all EN74-1:2005 and EN74-1:2022 scaffold couplers, together with brief details regarding the differences between the two standards. This product is available in PDF format only.
2 pages
Scaffold tube storage racks are a common feature of every scaffolding contractor’s yard and many long-term live sites. Whilst tube racks are usually constructed as basic birdcage-like structures, they generally support many tonnes of equipment, so their design needs special consideration. This guidance note considers the design, use and maintenance of scaffold tube storage racks. 6 pages
Please enter a postcode to search for a member:
Please complete the fields below: