A free and comprehensive Guidance Index listing all NASC titles can be downloaded here.
We offer free delivery on orders over £10 (unless otherwise stated). UK orders only online, for international orders please contact NASC:
The purpose of this guidance is to provide guidance on the management of long-standing scaffolding structures. Throughout the industry scaffolds are erected to provide long-term access requirements and often remain in position for many months or even years, for example temporary yard sheds, scaffolding material racking systems, maintenance scaffolds etc.
This Safety Guidance provides safety measures for scaffolding work carried out over / near water (including on, adjacent to or over water) where potential hazards exist. Employers should conduct a comprehensive risk assessment for this kind of work, taking into account the hazards identified and evaluated during the assessment, to develop a safe system of work. Employers are also responsible for providing their workers with the necessary safety information, instruction, training, and supervision. In addition, safety measures on the use of lifting appliances / mobile plant, lifejackets / buoyancy aids for work over / near water should be intensified throughout the construction period. To prevent any person from falling from a height, suitable safety measures should also be developed and implemented. Besides, effective rescue and emergency arrangements should be well established for work over / near water so as to safeguard the workers in an emergency situation.
This guidance provides simple, practical and cost effective measures which employers can use to help prevent and manage the risk of violence to lone workers. Effective measures do not have to be expensive. The most effective solutions usually arise from the way the business is run, such as staff training, working procedures and the physical environment. High-cost security equipment will normally only be needed where there is a particularly high risk. 6 pages.
Many scaffolding contractors are unaware of the requirements of BS 5975:2019, ‘Code of practice for temporary works procedures and permissible stress design of falsework’, which contains information regarding procedural controls for the management of temporary works. These controls not only apply to falsework, but also to all types of scaffolding. Whilst BS 5975 is not a legal requirement, it is often used by Health and Safety Executive (HSE) inspectors, when visiting sites, as the expected benchmark for appropriate controls required for the management of temporary works on site. The NASC has therefore produced a brief, simple and concise guide to assist scaffolding contractors and others involved with the delivery and management of temporary works. This includes an outline of the requirements and how they can be simply and practically achieved.
Please enter a postcode to search for a member:
Please complete the fields below: