£19.70
This safety guidance note provides guidance for the UK scaffolding industry on the selection, safe erection, alteration, and dismantling of scaffold component guardrails, constructed in tube & fitting to provide edge protection to Class A and B surfaces. It should be read in conjunction with TG1 Temporary Edge Protection, which has been recently released.
This product is available in PDF format only.
16 pages
The SG6 manual handling video can now be viewed free of charge on the NASC website here: https://nasc.org.uk/information/sg6-video/
This document gives scaffolding companies and clients guidance on The Work at Height Regulations 2005 (WAHR 2005) relating to safe means of access to and from scaffolding working platforms. The Construction (Design and Management) Regulations (CDM) outline that clients, principal designers, principal contractors, designers and contractors should consider what form of access may be needed at the planning stage. This should include any emergency escape routes that have been identified by the risk assessment, the preferred option for access / egress and the required number of access points. On larger projects powered passenger / goods hoists may be a safer option if available. Where passenger hoists are used, an additional means of access will be required for emergency purposes (e.g. in the event of a fire or mechanical failure). This update is significant in that key changes are ‘Ladder Safety’ and ‘Security’ of access onto scaffolds that differs to the earlier SG25:14. 16 pages
Due to the nature of their work, scaffolders need to carefully consider any work that will be carried out in the vicinity of overhead power lines. This guidance enables operatives to understand the various hazards when working around overhead power lines and the procedures for applying safe working practices and earthing scaffold structures. 12 pages
The NASC are committed to involving everyone in health and safety matters whether on construction sites or in the office. To effect a change we must consider our workforce and consult with all those involved in a project, listening to and where necessary acting upon the views of the workforce. 8 pages
Please enter a postcode to search for a member:
Please complete the fields below: