£5.45
Traditionally, flame retardant timber decking has long been a fundamental requirement for scaffolding in various sectors of the industry. However, in the light of the ‘Grenfell’ disaster, there has been a substantial increase in the number of contracts which specify the need for flame retardant scaffold boards.
This document gives details of various fire retardant treatments available, the recommended specification and guidance for care and storage. This guidance is available for pdf download only.
2 pages.
The effects of heat on scaffolding equipment can have a significant and permanent effect on its strength and performance. This guidance explains the potential issues and the action to be taken if equipment has been subjected to a fire or similar conditions. This guidance is available for pdf download only.
This guide is intended to aid those who commission scaffold designs by summarising the responsibilities of each party involved at each stage of the process. It also details the requirements for preparing a design brief with information required by the Designer to enable a suitable and sufficient design to be produced, as well as outlining the design process, checking requirements and expected output information. This document is complimented by CG6: Scaffold Design. 6 pages.
This guidance note is concerned with advice for the safe erection, use and dismantling of temporary suspended chutes intended for the conveyance of waste construction materials. The guidance covers chutes constructed of detachable sections made of metal or non-metallic material, attached to scaffolding. 4 pages
This guidance gives details of the stress corrosion cracking (SCC) that can occur in certain materials when subjected to tensile stress and specific corrosive environments. Although rare in our industry, it can lead to unexpected sudden failure of certain metals. Whilst chemical environments and alloys are highly specific, this guidance explains the process by which SCC can occur and advises that specialist advice may be needed where SCC is possible or has occurred in the past. This guidance is available for pdf download only.
2 pages
TG20 provides the definitive guidance for scaffolding constructed with tube and fittings throughout the UK. TG20:21 builds on TG20:13, and makes the eGuide software, Design Guide and Operational Guide available via the new NASC ePortal, on a subscription basis. The eGuide produces pdf compliance sheets, which now include more information and an illustration. The guides are fully searchable online. The ePortal is available here from computers, tablets and smart phones via web browsers. Each subscription gives access from multiple machines, but only one machine at a time. Purchase and use of a subscription implies acceptance of the subscription agreement, found here, by all users. There will be a delay between a purchase on the website and activation on the ePortal. Purchase activation will only take place during normal office hours. The price shown includes VAT at 20%. To pay the NASC member price, log in to the web site before completing your purchase. To renew more than one subscription please add serial numbers to the basket one at a time.
Please enter a postcode to search for a member: