This guidance gives details of various methods available for satisfactorily securing scaffold boards to prevent movement. Users should satisfy themselves when/which boards require tying down and that any proprietary equipment or fixing method selected meets their requirements.
This product is available in PDF format only.
4 pages
Other than for very small contracts most contracts of any size have a pre-contract meeting. The primary purpose of the meeting is often for the parties to clarify specific points in the enquiry and quotation. This guidance outlines items to be covered in the meeting, pitfalls and a recommended strategy. 2 pages
A licence is required in order to erect a scaffold on or above the public highway. The licence is issued under section 169 of the Highways Act 1980, generally by the highway authority responsible for the particular stretch of highway. This guidance indicates the type of information that may be required. 2 pages
The purpose of this guidance note is to bring together, in one document, some of the more common qualifications used by members. It is not suggested that the list is exhaustive or that the wording of individual clauses is appropriate to each and every similar situation. However, it may serve as a check list for estimators. 10 pages
This guidance note sets out the information that the Scaffolding Company should seek from the Employer. This information will be used by the Scaffolding Company in order to produce their Quotation and will be the basis for their offer. It is important that the Scaffolding Contractor obtains as much information about the Project as possible prior to firming up their price in order to reduce the risk they are exposed to. 4 pages
This guidance explains the differences between ‘supplementary’ and ‘check’ couplers and gives typical design applications where high coupler forces could be expected and where additional loadbearing capacity to connections may be required. It also contains guidance on coupler configurations and expected safe working loads (SWLs) where supplementary couplers are used. To ensure that SWL values are as accurate as possible, data provided within this document is based on practical testing rather than calculation. 2 pages
BS2482:2009 defines both visual and machine strength grading standards for 38mm x 225mm boards supported at 1.2m spans and 63mm x 225mm boards supported at 2.5m spans; and machine strength grading standards only for 38mm x 225mm boards supported at 1.5m spans. This guidance is reviewed on the basis of removing A grade boards that should not exist. A visually graded board is still a BS2482 product and should be marked as such on the end band. 6 pages
This guide is intended to aid those who commission scaffold designs by summarising the responsibilities of each party involved at each stage of the process. It also details the requirements for preparing a design brief with information required by the Designer to enable a suitable and sufficient design to be produced, as well as outlining the design process, checking requirements and expected output information. This document is complimented by CG6: Scaffold Design. 6 pages.
Many free-standing scaffolding structures, such as access towers, major signboards, fences and enclosures, need to be anchored to the ground, primarily to resist wind forces. Whilst all structures requiring restraint via anchoring to the ground should be subject to a bespoke design produced by a competent engineer, the guidance considers different types of anchors available and typical indicative holding capacities, the possibility of disturbing underground services, the use of guys and scaffold tube restraint. 6 pages