This guidance note relates to schedules intended to be used for the valuation of additional work and/or variations to existing lump sum contracts. For the avoidance of doubt this guidance note does not relate to schedules of rates used in connection with contracts which are re-measured as the works proceed.
This guidance is available for pdf download only.
The supply of hoists, for the use of others, by scaffolding contractors as part of a typical scaffolding contract can give rise to a number of problems, particularly if the equipment is being cross hired from another supplier under the CPA terms and conditions. This guidance outlines the main issues and possible solutions. 2 pages
Daywork is a method of valuing construction work according to the time spent carrying out work together with the value of the plant and materials resources used. It is an alternative to valuing work by measurement. This guidance outlines when daywork can be charged, how it can be calculated and administration. This guidance is available for pdf download only. 4 pages
A licence is required in order to erect a scaffold on or above the public highway. The licence is issued under section 169 of the Highways Act 1980, generally by the highway authority responsible for the particular stretch of highway. This guidance indicates the type of information that may be required. 2 pages
The reliance by the scaffolding contractor, on the skill and expertise of their operatives, will not relieve them of their responsibility for the adequacy of the design. This guidance outlines design criteria, training needs, insurance, ownership/copyright and common misconceptions when utilising a designer for scaffolding. 4 pages